Writing tips and writing guidelines for students,case study samples, admission essay examples, book reviews, paper writing tips, college essays, research proposal samples
Friday, May 22, 2020
Project manager for a Cable Planning Essay
As the venture chief for a Cable Planning group, I will deal with the production of the link plan for another structure that will be worked, with development set to start in about a month and a half. My first errand in making a Cabling Plan is to build up an Executive Summary that will contain the Project Introduction and Infrastructure Cable Specifications and Standards. My director gave me the general undertaking plan that incorporates: A definite portrayal of the new structure, including the complete number of PCs for the entirety of the representatives of the organization. Likewise the server and system topology equipment that is required to assemble the framework. Link Standards and Codes: ANSI/NEMA Standards Publication No. WC 66-2001 ââ¬Å"Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pair Cablesâ⬠ANSI/TIA/EIA-526-7 ââ¬Å"Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plantâ⬠ANSI/TIA/EIA-526-14A ââ¬Å"Optical Power Loss Measurements of Installed Multimode Fiber Cable Plantâ⬠BICSI TDMM ââ¬Å"Telecommunications Distribution Methods Manual, eleventh Editionâ⬠CENELEC EN 50173:2000 and alterations ââ¬Å"Information Technology â⬠Generic Cabling Systemsâ⬠IEC/TR3 61000-5-2 â⬠Ed. 1.0 and alterations ââ¬Å"Electromagnetic similarity (EMC) â⬠Part 5: Installation and moderation rules â⬠Section 2: Earthing and cablingâ⬠ISO/IEC 11801:2002 Ed 2.0 and alterations ââ¬Å"Information innovation â⬠Generic cabling for client premisesâ⬠NFPA70 National Electric Code â⬠Article 645 and Article 800 2.2.15. NFPA 70E ââ¬Å"Standard for Electrical Safety in the Workplace, 2004 Editionâ⬠2.2.16. NFPA 75 ââ¬Å"Standard for the Protection of Information Technology Equipment, 2003 Ed.â⬠Building Standards and Codes: ANSI/TIA/EIA-568-B.1, ANSI/TIA/EIA-568-B.2, ANSI/TIA/EIA-568-B.3, and addenda ââ¬Å"Commercial Building Telecommunications Cabling Standard â⬠Part 1: General Requirementsâ⬠ââ¬Å"Commercial Building Telecommunications Cabling Standard â⬠Part 2: Balanced Twisted-Pair Cabling Components (December 2003)â⬠ââ¬Å"Commercial Building Telecommunications Cabling Standard â⬠Part 3: Optical Fiber Cabling and Components Standardâ⬠ANSI/TIA/EIA-569-B and addenda ââ¬Å"Commercial Building Standard for Telecommunications Pathways and Spacesâ⬠ANSI/TIA/EIA-606-An and addenda ââ¬Å"Administration Standard for the Telecommunications Infrastructure of Commercial Buildingsâ⬠NFPA 76 ââ¬Å"Standard for the Fire Protection of Telecommunications Facilities, 2005 Editionâ⬠ANSI-J-STD-607-An and addenda ââ¬Å"Commercial Building Grounding and Bonding Requirements for Telecommunicationsâ⬠Task Materials â⬠¢Fiber-Optic Design Considerations a)We will use fiber optics in different manners. We will create the spine, and riser runs with fiber optic links. â⬠¢Basement Server Complex Design a)The server will have a system limit that surpasses the 110 individuals/PCs in the storm cellar. One PC for every individual. b)We will fix every one of these PCs to the divider outlet with standard Cat6 fix links. c)Risers and spines will be developed with fiber optic links. d)Horizontal runs with use Cat6 cabling. e)We will require 5 Cisco WS-C3750 G-24PS-S:24 Ports impetus changes to keep up the base standard of having 4 ports free on each switch â⬠¢Standard Floor Design a)The organize limit of this plan is to surpass 200 individuals/PCs. One PC for every individual. b)I will fix every one of these PCs to the divider outlet with standard Cat6 fix links. c)Risers and spines will be built with fiber optic links. d)Horizontal runs with use Cat6 cabling. e)I will require 10 Cisco WS-C3750 G-24PS-S:24 Ports impetus changes to keep up the base standard of having 4 ports free on each switch. â⬠¢Fiber-Optic Characteristics: a)SC connectors will be utilized to end optical links. â⬠¢Bandwidth a)The equipment we are introducing will have a speed of 1Gbps. â⬠¢Attenuation a)I will utilize uncommon apparatuses to test for weakening as the task advances, and supplant likewise. â⬠¢Electromagnetic Immunity a)I will occasionally test for obstruction. â⬠¢Link Performance Analysis a)I will plan occasional tests to confirm execution, and data transfer capacity speeds. â⬠¢Cable Transmission Performance a)I will test for irregularities in transmissions sent and got. â⬠¢Splice and Connector Performance a)I will test every end and connector to guarantee it meets or surpasses the normal measures. â⬠¢Power Budget a)I will compute every gadget power necessity, to guarantee satisfactory force is given. b)I will utilize vitality proficient strategies, which won't penance execution, however guarantee that utility expenses don't surpass the spending plan. Standard floor format
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.